首页> 外文期刊>Journal of Construction Engineering and Management >Daily Work Reports-Based Production Rate Estimation for Highway Projects
【24h】

Daily Work Reports-Based Production Rate Estimation for Highway Projects

机译:基于日常工作报告的公路项目生产率估算

获取原文
获取原文并翻译 | 示例
           

摘要

Production rate estimation of major construction activities in a project play an important role in the planning of resources, tracking project progress, and determining contract time of construction projects as these activities typically fall in the critical path of the project schedule. This paper discusses the possiblity that readily available data from highway agencies such as Daily Work Reports (DWRs), soil data, average traffic information, and weather information can be successfully used to identify and assess significant factors that must be considered in estimating the production rates of major highway activities and to develop production rate estimation models. Common production rate estimation methods such as expert opinion, engineering judgment, and production rate charts may lead to erratic production rate estimation by comparing the production rates calculated and estimated through different methods. Actual project data-based production rate estimation might be the most reliable method. An Excel-based software program was developed in this study for estimating the production rates of controlling highway construction activities when project information is given as input data.
机译:项目中主要建设活动的生产率估算在资源规划,跟踪项目进度以及确定建设项目的合同时间方面起着重要作用,因为这些活动通常属于项目进度表的关键路径。本文讨论了以下可能性:高速公路机构的即时可用数据(例如每日工作报告(DWR),土壤数据,平均交通信息和天气信息)可以成功地用于识别和评估在估算生产率时必须考虑的重要因素。主要高速公路活动,并开发生产率估算模型。通过比较通过不同方法计算和估算的生产率,常见的生产率估算方法(例如专家意见,工程判断和生产率图表)可能导致不稳定的生产率估算。基于实际项目数据的生产率估算可能是最可靠的方法。在这项研究中开发了一个基于Excel的软件程序,用于在将项目信息作为输入数据给出时估算控制高速公路建设活动的生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号