首页> 外文期刊>Journal of Construction Engineering and Management >Effects of the Last Planner System on Social Networks among Construction Trade Crews
【24h】

Effects of the Last Planner System on Social Networks among Construction Trade Crews

机译:最后计划者系统对建筑业工作人员中社交网络的影响

获取原文
获取原文并翻译 | 示例
       

摘要

Lean system thinking concerning the mechanics of construction production systems suggests that the Last Planner System (LPS) improves workflow by creating pull flow and by filtering work packages for maturity. However, empirical evidence shows that even where implemented only partially, LPS can still improve workflow. The authors hypothesize that the LPS engenders a social network among the subcontractors, which enhances coordination. Twelve residential construction projects were studied using action research over periods from 7 to 16months to measure the impact of the LPS on social networks. Centrality degrees of trade crews rose significantly and the number of active essential communication channels roughly doubled when comparing projects with low and high planning best-practice index scores, showing that where the LPS is more thoroughly implemented, social networks are strengthened. The results contribute new understanding of the LPS and its mechanism. The LPS not only functions on the technical level to improve production control, it also has social impact, building relationships among construction teams that can contribute to improved coordination. (C) 2015 American Society of Civil Engineers.
机译:有关建筑生产系统力学的精益系统思想表明,Last Planner System(LPS)通过创建拉动流程和过滤工作包以使其成熟来改善工作流程。但是,经验证据表明,即使仅部分实施LPS,LPS仍可以改善工作流程。作者假设LPS在分包商之间形成了社交网络,从而增强了协调性。使用行动研究研究了12个住宅建设项目,历时7到16个月,以测量LPS对社交网络的影响。在比较计划最佳实践指数得分较低和较高的项目时,贸易人员的中心化程度显着提高,有效的基本沟通渠道数量几乎翻了一番,这表明在LPS得到更全面实施的地方,社交网络得到了加强。结果有助于对LPS及其机制的新认识。 LPS不仅在技术层面上发挥作用,以改善生产控制,而且还具有社会影响力,在施工团队之间建立关系可以促进改善协调。 (C)2015年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号