A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects

机译:基于模糊的综合评估工程项目时间突发事件的框架

获取原文
获取原文并翻译 | 示例

摘要

Assessing time contingency is an important part of construction project scheduling because it helps generate a more reliable schedule. Traditionally, the assessment is made using expert judgment and inherently inserted to the estimated activity duration and/or comprehensively placed at the project level. This practice has a major drawback in that project-specific risks that require time contingency are not explicitly identified and treated. Risk management is performed in isolation to project scheduling. This paper presents a new framework for assessing the time contingency required for activities exposed to multiple risks. Fuzzy set theory is employed to model the imprecision and vagueness associated with the possibility of risk occurrence and the impact of those risks on activity durations. Alternative risk responses can be explored and their impacts on the project duration can be evaluated. A real-life case example was used to demonstrate the application of the framework. The results indicate that risk management can systematically be incorporated into scheduling. The impact of multiple risks on activity time contingency can effectively be estimated. The robustness of the schedule can be enhanced through iterative response planning. The newly developed framework thus provides construction planners with a practical tool for proactively assessing the impact of the project-specific risks on major milestones and project deadlines. This study advances the current practice of time contingency estimations by introducing an integrated approach for risk management and project scheduling. It also advances the application of fuzzy sets theory in assessing impact on activity durations subjected to multiple risks. (C) 2015 American Society of Civil Engineers.
机译:评估时间突发事件是建设项目计划的重要部分,因为它有助于生成更可靠的计划。传统上,评估是使用专家判断进行的,并固有地插入到估计的活动持续时间中和/或综合置于项目级别。这种做法的主要缺点是,没有明确识别和处理需要时间应变的项目特定风险。风险管理是独立于项目计划执行的。本文提出了一个新的框架,用于评估面临多种风险的活动所需的时间应急。采用模糊集理论对与风险发生的可能性以及这些风险对活动持续时间的影响相关的不精确性和模糊性进行建模。可以探索其他风险应对措施,并可以评估其对项目工期的影响。一个真实的案例实例被用来演示该框架的应用。结果表明,可以将风险管理系统地纳入调度中。可以有效地估计多种风险对活动时间偶然性的影响。可以通过迭代响应计划来增强计划的鲁棒性。因此,新开发的框架为施工规划人员提供了一种实用的工具,可以主动评估特定于项目的风险对主要里程碑和项目期限的影响。本研究通过引入风险管理和项目调度的集成方法,推进了时间不可预测性的当前实践。它还提高了模糊集理论在评估遭受多种风险的活动持续时间的影响中的应用。 (C)2015年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号