Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning

机译:建筑工作面规划的资源供需匹配调度方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses a novel approach for resource-based scheduling that builds upon existing analytical models to achieve practical allocation of resources that are constrained by supply and demand. The approach facilitates workface planning to allocate work to individual craft persons. The main contribution of the work is advancement of the current scheduling practice of workface planning by (1) generalizing the resource supply-demand matching problem (RSDMP); and (2) formalizing the RSDMP scheduling approach for planning resource workflows which consists of (a) the mathematical model, (b) a two-stage optimization approach, and (c) innovative use of a resource-activity interaction table. The result is an optimum resource-constrained schedule providing the shortest project duration with the leanest resource supply. The optimum resource requirement is identified between the lower and upper bounds of the resource supply limit, thus ensuring the site's spatial and safety requirements. The optimum resource workflows of individual craft persons are presented to facilitate the project execution at the workface level. To illustrate the approach, an example adapted from a classic textbook is used. To demonstrate the effectiveness of the approach on a practical level, an oil refinery turnaround project including input data and relevant information prepared for workface planning is used. As a result of the RSDMP analysis, the optimum plan obtained is resource-loaded, practically feasible, and workface executable. (C) 2015 American Society of Civil Engineers.
机译:本文讨论了一种基于资源的调度的新方法,该方法基于现有的分析模型来实现受供需约束的资源的实际分配。该方法有助于进行工作面规划,以将工作分配给各个工艺人员。该工作的主要贡献是通过(1)概括资源供需匹配问题(RSDMP)来改进当前的工作面计划调度实践。 (2)正式化用于计划资源工作流的RSDMP调度方法,该方法由(a)数学模型,(b)两阶段优化方法和(c)创新使用资源-活动交互表组成。结果是最佳的资源受限计划,提供了最短的项目工期和最精简的资源供应。在资源供应限制的上下限之间确定最佳资源需求,从而确保场地的空间和安全需求。提出了各个工艺人员的最佳资源工作流程,以促进在工作面级别上的项目执行。为了说明该方法,使用了一个经典教科书改编的示例。为了在实践上证明该方法的有效性,使用了一个炼油厂周转项目,其中包括为工作面规划准备的输入数据和相关信息。作为RSDMP分析的结果,获得的最佳计划是资源丰富的,切实可行的并且可以执行工作面。 (C)2015年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号