首页> 外文期刊>Journal of Construction Engineering and Management >Estimation of Optimal Productivity in Labor-intensive Construction Operations: Advanced Study
【24h】

Estimation of Optimal Productivity in Labor-intensive Construction Operations: Advanced Study

机译:劳动密集型建筑运营的最佳生产率估算:高级研究

获取原文
获取原文并翻译 | 示例

摘要

The traditional practice of comparing actual productivity versus historical productivity only provides relative efficiency data rather than absolute efficiency data. Innovatively, a two-prong strategy for estimating optimal labor productivity by quantifying systematic and operational inefficiencies allows project managers to estimate the absolute efficiency of their labor-intensive operations and compare actual productivity against an objective benchmark. Although this two-prong strategy was previously validated for a simple task with a single worker performing sequential actions, no study has confirmed the feasibility of applying this approach to complex operations involving multiple workers or sequential and/or parallel tasks and actions. Because adding more workers increases not only the complexity of the construction operation but also the complexity of calculating optimal productivity, this study expands the current body of knowledge by augmenting the two-prong strategy's methodology to apply the approach to a complex, multiworker operation necessitating both sequential and parallel tasks and actions. The feasibility of the expanded methodology is tested using a case study involving the fabrication of sheet metal ducts that includes 8 workers performing 8 tasks and 45 actions. This paper reviews relevant literature; tests the feasibility of the two-prong strategy on a complex, labor-intensive operation; analyzes the data; evaluates the strategy; and confirms the framework as a tool for accurately estimating optimal productivity in complex construction activities. The success of this framework better enables project managers to measure and manage the productivity of their labor-intensive construction operations.
机译:比较实际生产率和历史生产率的传统做法仅提供相对效率数据,而不是绝对效率数据。创新地,通过量化系统和运营效率低下的最佳效率劳动生产率的两管齐下的策略,项目经理可以估算其劳动密集型运营的绝对效率,并将实际生产率与客观基准进行比较。尽管以前采用单个工作人员执行顺序操作的简单任务验证了这种两管齐下的策略,但尚无研究证实将这种方法应用于涉及多个工作人员或顺序和/或并行任务和操作的复杂操作的可行性。因为增加更多的工人不仅增加了施工操作的复杂性,而且增加了计算最佳生产率的复杂性,所以本研究通过增加“两管齐下”的策略方法,将方法应用于复杂的多工操作,从而扩展了当前的知识体系。顺序和并行的任务和动作。使用案例研究测试了扩展方法的可行性,该案例研究涉及钣金管道的制造,该管道包括8名工人执行8个任务和45个动作。本文回顾了相关文献。在复杂,劳动密集型的操作中测试“两管齐下”策略的可行性;分析数据;评估策略;并确认该框架是在复杂建筑活动中准确估算最佳生产率的工具。该框架的成功使项目经理能够更好地衡量和管理其劳动密集型建筑运营的生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号