Time, Cost, and Energy Consumption Analysis on Construction Optimization in High-Rise Buildings

机译:高层建筑施工优化的时间,成本和能耗分析

获取原文
获取原文并翻译 | 示例
           

摘要

The multiobjective optimization problems in project management have always been the issues on which project managers focus. Currently, few investigators consider the multiobjective optimization model suitable for high-rise buildings considering energy consumption optimization problems in construction. Nevertheless, the implementation of civil engineering in the construction industry is always an important cause of energy consumption. In this study, construction process analysis (CPA) is used to calculate statistical parameters of the energy consumption in high-rise buildings during the construction stage. Principal component analysis (PCA) is then used to describe the correlation among time, cost, and energy consumption, and also quantifies their interdependence. The statistical analysis illustrates that the correlation between energy consumption and cost is stronger than that between energy consumption and time. And the correlation between cost and time is similar to that between time and energy consumption. Additionally, cost and energy consumption have a positive correlation, cost and time have a negative correlation, and time and energy consumption also have a negative correlation. The major contribution of this study is to provide a time-cost-energy consumption multiobjective optimization model taking account of the different decision preferences of project managers. It could also help project managers create the best combination of project construction activities in practical engineering management. The simulation in a real case is proposed to verify the accuracy of the model. Furthermore, the model could also provide reference value for further construction projects.
机译:项目管理中的多目标优化问题一直是项目经理焦点的问题。目前,很少有调查人员考虑考虑考虑施工能耗优化问题的高层建筑物的多目标优化模型。尽管如此,建筑业土木工程的实施始终是能源消耗的重要原因。在该研究中,施工过程分析(CPA)用于在施工阶段计算高层建筑中的能量消耗的统计参数。然后使用主成分分析(PCA)来描述时间,成本和能量消耗之间的相关性,并量化它们的相互依赖性。统计分析说明能量消耗与成本之间的相关性比能量消耗和时间之间的相关性更强。成本和时间之间的相关性类似于时间和能量消耗之间的相关性。另外,成本和能量消耗具有正相关,成本和时间具有负相关性,并且时间和能量消耗也具有负相关性。本研究的主要贡献是提供时间 - 能源消耗多目标优化模型,考虑到项目经理的不同决策偏好。它还可以帮助项目经理在实际工程管理中创造项目建设活动的最佳组合。建议在实际情况下进行模拟以验证模型的准确性。此外,该模型还可以为进一步的建筑项目提供参考值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号