...
首页> 外文期刊>Journal of Construction Engineering and Management >Assessment of Readability Risks in Contracts Causing Conflicts in Construction Projects
【24h】

Assessment of Readability Risks in Contracts Causing Conflicts in Construction Projects

机译:评估造成建筑项目冲突的合同中可读性风险

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Readability and comprehensibility of contracts are important. A contract would be more practical and functional if the clauses can be interpreted more consistently. Therefore, an analysis of risks influencing readability of construction contracts other than the more common approach of analyzing operational risk is essential. This paper aims to assess risk factors affecting readability of contracts to avoid or minimize conflicts among project parties by adopting a fuzzy Visekriterijumska Optimizacija I Kompromisno Resenje (VIKOR) technique. Readability risks were analyzed based on conflicting potential interpretations of clauses on time, cost, and quality criteria. The results identified the top three risks as: (1) unnecessary complexity in using nouns and improper use of referents; (2) the use of abstract and ambiguous words or sentences leading to multiple interpretations; and (3) unnecessarily long sentence length. To establish consensus among experts, compare stakeholders' perceptions, and ensure the robustness of the model, interrater agreement (IRA) analysis, Mann-Whitney U test, and sensitivity analysis were performed. The findings can help contract drafters recognize the importance of the role of readability of contracts. Improved readability can potentially lead to reduced conflicts, claims, and disputes in construction projects. (C) 2021 American Society of Civil Engineers.
机译:合同的可读性和可理解性很重要。如果条款可以更加持续解释,则合同将更加实用和功能。因此,对影响施工合同可读性的风险分析,除了分析操作风险的更常见方法之外至关重要。本文旨在评估影响合同可读性的风险因素,以避免或尽量减少项目缔约方之间的冲突,采用模糊的vienskriterijumska OptimizaCija i Kompromisno Resenje(Vikor)技术。可读性风险基于对时间,成本和质量标准对条款的冲突潜在解释进行了分析。结果将前三个风险标明为:(1)使用名词和指示不当使用不必要的复杂性; (2)使用抽象和暧昧的单词或句子导致多种解释; (3)不必要的长句子长度。为了在专家之间建立共识,比较利益攸关方的看法,并确保模型的稳健性,Interrater协议(IRA)分析,Mann-Whitney U测试和敏感性分析。调查结果可以帮助合约起草人认识到合同可读性作用的重要性。提高可读性可能导致建设项目中减少冲突,索赔和纠纷。 (c)2021年美国土木工程师协会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号