Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives

机译:形式化施工顺序基本原理和分类机制的正式化,以支持快速生成顺序备选方案

获取原文
获取原文并翻译 | 示例
           

摘要

Resequencing construction activities is a critical task for project planners for effective project control. Resequencing activities require planners to determine the impact or "role" an activity has on successor activities. They also need to determine the status of activities, i.e., which activities may or may not be delayed. Distinguishing the role and status of activities in turn requires planners to understand the rationale for activity sequences. The current critical path method (CPM) framework, however, represents sequencing rationale using precedence relationships and distinguishes activities only with respect to their time-criticality. Thus, planners find it difficult to keep track of individual sequencing logic, and manually inferring the role and status of activities becomes practically prohibitive in complex project schedules. The research presented in this paper addressed this limitation of the CPM framework by formalizing a constraint ontology and classification mechanism. The ontology allows planners to describe their rationale for activity sequences in a consistent and intuitive way, whereas the classification mechanism leverages the ontology to automatically infer the role and status of activities. The ontology and mechanisms were implemented in a prototype tool. With this tool, users can quickly verify which activities to delay to expedite critical milestone or bottleneck activities, thus making it possible to quickly evaluate and generate sequencing alternatives in CPM-based schedules.
机译:对施工活动进行重新排序是项目规划人员进行有效项目控制的关键任务。对活动进行重新排序需要计划者确定活动对后续活动的影响或“角色”。他们还需要确定活动的状态,即哪些活动可能会延迟也可能不会延迟。依次区分活动的角色和状态需要计划者了解活动序列的原理。但是,当前的关键路径方法(CPM)框架使用优先级关系表示排序依据,并且仅根据时间紧迫性来区分活动。因此,计划人员发现很难跟踪各个排序逻辑,并且在复杂的项目进度表中,手动推断活动的角色和状态实际上变得很困难。本文提出的研究通过规范约束本体和分类机制解决了CPM框架的这一局限性。本体允许计划者以一致和直观的方式描述活动序列的基本原理,而分类机制利用本体来自动推断活动的角色和状态。本体和机制是在原型工具中实现的。使用该工具,用户可以快速验证哪些活动需要延迟以加快关键的里程碑或瓶颈活动,从而可以在基于CPM的计划中快速评估并生成排序方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号