首页> 外文期刊>Journal of Cleaner Production >Methodology for upstream estimation of construction waste for new building projects
【24h】

Methodology for upstream estimation of construction waste for new building projects

机译:新建筑项目建筑垃圾上游估算方法

获取原文
获取原文并翻译 | 示例
           

摘要

Construction waste includes waste arising from construction works such as new build, renovation, demolition and road works. Through waste sorting and separation, inert material can be used to fill in reclamation sites; however, the non-inert portion of the construction waste still goes to landfills. However, Hong Kong is running out of landfill space. When determining reduction and management strategies for construction waste, the Government's objectives are to reduce waste generation, maximize reusing and recycling and reduce the intake of mixed construction waste at landfills. In order to develop and implement the waste reduction and management strategies at project level, proper quantification of construction waste generation is a prerequisite. Our research reveals that limited information is currently available for understanding the magnitude and composition of construction waste and for preparing an appropriate construction waste management plan for a project on new or existing facilities. To bridge the gap, the aim of this research is to present a comprehensive and practical approach for estimating the construction waste for building projects once detail design is carried out for new build or major retrofitting works. The estimation of waste quantities is based on the actual design information available from tender or contract documentation for a project at the upstream stage (a full set of bills of quantities classified under standard format). The proposed methodology of aggregating wastages accruing to quantified elements for a complete building has its advantages over a ball park figure established through indexing or other methods as proposed in existing literature, in terms of ensuring accuracy and maximizing the use of available design information whilst the workflow is uninterrupted.Three representative case studies with different formwork and facade systems are depicted to high-light the significant effects on waste generation in otherwise similar construction projects. (C) 2019 Elsevier Ltd. All rights reserved.
机译:建筑废物包括建筑工程所产生的废物,如新建,翻新,拆迁和道路工程。通过废物分选和分离,惰性材料可用于填充填海部位;然而,建筑物废物的非惰性部分仍然进入垃圾填埋场。然而,香港填埋场空间耗尽。在确定建筑垃圾的减少和管理策略时,政府的目标是减少废物产生,最大限度地减少重用和回收,并减少垃圾填埋场混合建筑垃圾的摄入量。为了开发和实施项目水平的废物减少和管理策略,适当的施工废弃发电量是先决条件。我们的研究表明,目前有限的信息目前可用于了解建筑垃圾的幅度和成分,并为新或现有设施的项目制定适当的建筑废物管理计划。为了弥补差距,本研究的目的是展示一项全面实用的方法,估计建筑项目的建筑垃圾一旦进行了详细的设计,为新的构建或重大改装工程进行了详细设计。废物量的估计是基于在上游阶段项目的投标或合同文件可获得的实际设计信息(在标准格式下分类的一整套数量票据)。所提出的赋予诸如完整建筑物的量化元素的量化元素的汇总的方法具有与现有文献中所提出的索引或其他方法建立的球公园图的优势,就确保准确性和最大化在工作流程的使用时使用可用的设计信息不间断地。采用不同模板和外立体系的三级代表性案例研究被描绘为高光对其他建筑项目中废物产生的显着影响。 (c)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号