首页> 外文期刊>Journal of Cleaner Production >An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery
【24h】

An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery

机译:调查矿山关闭及其相关成本对矿山规划和资源回收寿命的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Best practise environmental and social processes for mine closure at the time of decommissioning are well documented; however mine closure is often not given the recognition that it warrants during early mine planning phases. While it is recognised that mine closure and its associated costs need to be fully incorporated into the life of mine planning process, it is often not to the extent that it should be. This paper seeks to quantify the value that may be lost if closure planning is not adequately considered in life of mine planning and the difference in the mine plan between scenarios that adequately consider closure costs and those that do not. To demonstrate this, a case study is introduced for the purpose of investigating the effect of mine closure on various aspects of the mine design of a two dimensional copper deposit. Results indicate that mining operations may benefit from an altered mine plan whereby mine life is extended due to the time value of money aspect associated with closure. In addition to increasing the Net Present Value (NPV), the other significant finding is that this may also significantly improve resource recovery for minimal additional environmental disruption. It is demonstrated that mine closure needs to be incorporated as part of the optimal mine planning process from the very outset. It is also suggested that orebody characteristics such as size, shape, grade and dip are key variables in the closure cost/mine plan relationship. Mine closure and its associated costs need to be incorporated into the mine planning process to thus play a significant role in determining the ultimate pit limit, pushback design, production schedule, mine life, resource recovery and ultimately the profitability and NPV of an operation. (C) 2016 Elsevier Ltd. All rights reserved.
机译:退役时关闭矿场的最佳实践环境和社会过程已得到充分记录;但是,通常在采矿计划的早期阶段就没有意识到必须关闭煤矿。人们认识到,必须将排雷及其相关费用充分纳入排雷计划过程的整个过程中,但往往达不到应有的程度。本文试图量化如果在采矿计划的生命周期中未充分考虑关闭计划,以及充分考虑了关闭成本和未考虑关闭成本的方案之间的差异,那么可能损失的价值。为了证明这一点,引入了一个案例研究,目的是调查关闭采矿对二维铜矿床设计各个方面的影响。结果表明,采矿计划可能会因变更后的采矿计划而受益,由于与关闭相关的金钱方面的时间价值,从而延长了采矿寿命。除了增加净现值(NPV)之外,另一个重要发现是,这也可以显着提高资源回收率,同时将对环境的影响降到最低。事实证明,从一开始就需要将矿山关闭作为最佳矿山规划过程的一部分。还建议说,矿体特征(例如大小,形状,品位和倾角)是关闭成本/采矿计划关系中的关键变量。矿山关闭及其相关成本需要纳入矿山规划流程中,从而在确定最终矿井极限,推卸设计,生产进度,矿山寿命,资源回收以及最终的运营利润和净现值中发挥重要作用。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号