...
首页> 外文期刊>Journal of Cleaner Production >Methodology to calculate the installation costs of offshore wind farms located in deep waters
【24h】

Methodology to calculate the installation costs of offshore wind farms located in deep waters

机译:计算深水区海上风电场安装成本的方法

获取原文
获取原文并翻译 | 示例

摘要

This paper develops a Methodology to determine the installation costs of a floating wind farm installed offshore, the value of which depends on the type of floating offshore wind platform installed. In this context, several costs in the installation process have been defined: installation of the offshore wind generators, installation of the floating offshore wind substructures, installation of the anchoring and mooring, installation of the electric systems and the commissioning or start up of the floating offshore wind farm. Furthermore, several installation scenarios have been taken into consideration regarding the shipyard surface and draught, the number of lifts, the transport, the mooring strategy and the substation configuration. The method, tested for the region of Galicia and for three sorts of floating substructures: spar, semisubmersible and tensioned leg, allows to compare different alternatives of installing a floating offshore and the most ithportant aspects of the costs proposed. It can be useful for investors who decide to use this type of offshore renewable energy in the future.
机译:本文开发了一种方法论来确定海上安装的浮动风电场的安装成本,其价值取决于所安装的海上浮动风平台的类型。在此背景下,安装过程中已定义了几项成本:海上风力发电机的安装,浮动海上风电子结构的安装,锚固和系泊的安装,电力系统的安装以及浮动的调试或启动离岸风电场。此外,还考虑了几种安装方案,这些方案涉及船厂表面和吃水,升降机数量,运输,系泊策略和变电站配置。该方法在加利西亚地区以及三种浮式子结构上进行了测试:翼梁,半潜式和张紧的支腿,可以比较在海上安装浮力的不同方案以及所提议成本中最重要的方面。对于决定将来使用此类离岸可再生能源的投资者而言,这可能会很有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号