...
首页> 外文期刊>Journal of Cleaner Production >Evaluation of the reverse logistics performance in civil construction
【24h】

Evaluation of the reverse logistics performance in civil construction

机译:土建工程逆向物流绩效评价

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Reverse logistics is responsible for the return of materials to the production process to be reused, recycled, remanufactured, or have an environmentally correct final destination. Every year, civil construction generates a large volume of waste that can be recovered through reverse logistics. The performance evaluation of these activities is necessary for managers to know the real efficiency and effectiveness of their actions and to avoid unnecessary expenses and losses. However, this activity is still not widely practiced in developing countries, such as Brazil and Colombia. This research aims to propose a model for the evaluation of LR performance in civil construction to assist the practice of return activities in developing countries. Initially, a bibliographic search was performed to find indicators for the model. The reverse flow in the civil construction was mapped based on works published in Brazil and Colombia. From this mapping, a 12 indicators model was elaborated to approach supply logistics, internal logistics operations, and the waste management of the construction companies, in order to evaluate the performance of this sector. Also, these indicators were prioritized through the AHP method. With this prioritization, it is possible to know which indicator deserves greater attention from managers when implementing improvements. As a way to demonstrate applicability, the model was applied in a Brazilian company and other Colombian companies. It was noticeable that the Brazilian company does not have much control of its operations because it was not possible to calculate five indicators of the model due to lack of information, whereas in the Colombian company, only one indicator was not calculated due to lack of information. When analyzing the results obtained, the model provides useful data for the managers when demonstrating where the company is reaching its goals and where improvements in the process are necessary. Both companies have improving their performance in the green purchasing indicator as a priority. Both sets targets that were not met for this indicator, and according to the prioritization made by AHP, this is the point that deserves special attention from both companies. Improvement points deserve special attention from both companies. Therefore they were highlighted for each one of them and also for the model so that it could be applied in other organizations in the sector. (c) 2019 Elsevier Ltd. All rights reserved.
机译:逆向物流负责将物料返回生产过程,以进行重复利用,循环利用,再制造或在环境上正确的最终目的地。每年,民用建筑都会产生大量废物,可以通过逆向物流进行回收。这些活动的绩效评估对于管理人员了解其行为的真实效率和有效性以及避免不必要的支出和损失是必要的。但是,这种活动在巴西和哥伦比亚等发展中国家仍未得到广泛实践。这项研究的目的是为民用建筑中的LR性能评估提供一个模型,以协助发展中国家的回返活动。最初,进行书目搜索以找到模型的指标。根据在巴西和哥伦比亚出版的作品绘制了土建工程中的反向流图。通过此映射,精心设计了12个指标模型来处理供应物流,内部物流运营和建筑公司的废物管理,以评估该部门的绩效。而且,这些指标通过AHP方法进行了优先排序。通过这种优先级划分,可以知道在实施改进时哪个指标值得管理人员的更多关注。为了证明适用性,该模型已在巴西公司和其他哥伦比亚公司中应用。值得注意的是,巴西公司对其运营没有太多控制,因为由于缺乏信息而无法计算该模型的五个指标,而在哥伦比亚公司中,由于缺乏信息而未计算一个指标。在分析获得的结果时,该模型为管理人员提供了有用的数据,以说明公司在何处实现其目标以及在哪些方面需要改进流程。两家公司都将改善绿色采购指标的绩效作为优先事项。两者都设定了该指标未达到的目标,并且根据AHP的优先次序,这一点值得两家公司特别注意。两家公司都应特别注意改进点。因此,对它们中的每一个以及模型都突出显示了它们,以便可以将其应用于该行业的其他组织。 (c)2019爱思唯尔有限公司。保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号