An integrated assessment of the environmental, human health, and economic impacts based on life cycle assessment: A case study of the concrete and steel sumps

机译:基于生命周期评估的环境,人类健康和经济影响的综合评估:以混凝土和钢水库为例

获取原文
获取原文并翻译 | 示例
           

摘要

The sustainable building materials and construction methods have been recently highlighted to reduce the environmental and human health impacts. The steel sump is regarded as a suitable alternative to the concrete sump as it has a lower economic impact, but further research on its environmental and human health impacts has yet to be conducted. Thus, this study conducted an integrated assessment of the environmental, human health, and economic impacts of the concrete and steel sumps using life cycle assessment. When the environmental, human health, and economic impacts are considered at the same time, the installation scenarios of the steel sump were superior to those of the concrete sump by 11.35 -152.24%. Especially, SS-3 (i.e., installation scenarios #3 of steel sump) has 93.04 and 89.18% lower environmental and human health impacts, respectively, as well as an 81.47% lower construction cost compared to CS-3 (i.e., installation scenarios #3 of concrete sump). This is because the differences in the building material and the practical construction method used determine the environmental, human health, and economic impacts of the sump. The results will help designers or construction managers determine the installation scenario of the sump by considering its environmental, human health, and economic impacts. (C) 2019 Elsevier Ltd. All rights reserved.
机译:最近强调了可持续的建筑材料和施工方法,以减少对环境和人类健康的影响。钢集水槽被认为是混凝土集水槽的合适替代品,因为它具有较低的经济影响,但尚未对其环境和人类健康影响进行进一步研究。因此,本研究使用生命周期评估对混凝土和钢水坑的环境,人类健康和经济影响进行了综合评估。同时考虑环境,人类健康和经济影响时,钢水槽的安装方案比混凝土水槽的安装方案优越11.35 -152.24%。特别是,SS-3(即钢水槽的安装方案#3)对环境和人类健康的影响分别降低了93.04和89.18%,与CS-3(即安装方案#)相比,其建筑成本降低了81.47%。 3)。这是因为建筑材料和使用的实际施工方法的差异决定了集水槽对环境,人类健康和经济的影响。结果将帮助设计人员或施工经理通过考虑集水池的环境,人类健康和经济影响来确定集水池的安装方案。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号