...
首页> 外文期刊>Journal of Cleaner Production >Bi-objective green scheduling in uniform parallel machine environments
【24h】

Bi-objective green scheduling in uniform parallel machine environments

机译:统一并行机环境中的双目标绿色调度

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Green and sustainability issues are being considered extensively in industry and in the literature. Most of the green-related effects in the manufacturing sector can be modeled by the costs associated with the production machines due to their resource consumption and/or pollutant emission, as a part of the operation cost. Accordingly, taking into account the machine processing costs alongside the other production criteria is one of the main approaches to consider green issues in the production management problems. In the same way, scheduling as one of the major operational problems in the factories can benefit this point of view to involve sustainability aspects. In this paper, the aforementioned modeling approach is taken one more time to establish a formulation for a green scheduling problem in uniform parallel machine environments. Here, it is assumed that the machines have different processing cost rates, i.e. they are different with regard to sustainability. The considered problem objectives are the total green cost and the makespan which are minimized simultaneously with the aim of earning Pareto optimal solutions. To this end, the epsilon-constraint method is first used to convert the problem into single objective problems. Then an existing heuristic is improved to solve these problems and estimate the Pareto solutions that show the trade-offs between the green cost objective and the ordinary time objective. Moreover, having a rigorous analyze in a theorem, some useful upper bounds for the gap of the green cost of the heuristic solution from optimality is derived. Finally, conducting numerical experiments at the end of the paper, the superiority of the improved heuristic to the previous one and its effectiveness in approximating the Pareto optimal solutions is demonstrated. (C) 2019 Elsevier Ltd. All rights reserved.
机译:绿色和可持续性问题在行业和文献中得到了广泛的考虑。制造业中大多数与绿色相关的影响可以通过生产机器的资源消耗和/或污染物排放相关的成本来建模,作为生产成本的一部分。因此,将机械加工成本与其他生产标准一起考虑是在生产管理问题中考虑绿色问题的主要方法之一。同样,调度是工厂中的主要运营问题之一,可以从涉及可持续性方面的观点中受益。在本文中,上述建模方法花费了更多时间来建立统一并行机环境中的绿色调度问题的公式。在此,假定机器具有不同的处理成本率,即,关于可持续性它们是不同的。考虑的问题目标是总绿色成本和制造期,同时将其最小化,以期获得Pareto最佳解决方案。为此,首先使用ε约束方法将问题转换为单目标问题。然后,对现有的启发式方法进行改进以解决这些问题并评估Pareto解决方案,该解决方案显示了绿色成本目标与普通时间目标之间的权衡。此外,在一个定理中进行了严格的分析,得出了启发式解的绿色成本与最优性之间的差距的一些有用的上限。最后,在本文的最后进行了数值实验,证明了改进的启发式算法对前一种算法的优越性及其在逼近帕累托最优解中的有效性。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号