DEVELOPING BIM-ASSISTED AS-BUILT SCHEDULE MANAGEMENT SYSTEM FOR GENERAL CONTRACTORS

机译:开发基于BIM的总承包商时间表管理系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.
机译:建设项目控制试图通过有效增强动态进度控制和管理来获取实时的竣工进度信息并消除项目延迟。对于总承包商而言,用于在施工阶段以视觉方式增强竣工进度的合适平台是必要且重要的。随着建筑信息模型(BIM)的应用变得越来越普遍,与BIM方法集成的进度管理对于在施工阶段增强总承包商的视觉施工管理实施变得至关重要。为了增强总承包商更新的竣工进度表的可视化效果,本研究提出了一种新颖的系统,称为台湾总承包商的施工BIM辅助进度管理(ConBIM-SM)系统。这项研究的主要目的是为总承包商开发一个Web ConBIM-SM系统,以增强可视化的竣工进度表信息共享和跟踪施工进度表的效率。最后,将ConBIM-SM系统应用于台湾某商业建筑项目的案例研究,以验证其有效性并证明其在施工阶段的有效性。 ConBIM-SM系统的优点在于提高了总承包商的项目控制和管理效率,并提供了BIM辅助的竣工进度跟踪和管理,可以通过Web浏览器访问最新的竣工进度信息。案例研究结果表明,ConBIM-SM系统是一个有效的可视化竣工进度管理平台,与BIM方法集成在一起,可用于建筑项目的总承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号