MEASURING CASH FLOW AND OVERDRAFT FOR FUZZY PROJECT NETWORKS WITH OVERLAPPING ACTIVITIES

机译:具有重叠活动的模糊项目网络的现金流量和透支额度测量

获取原文
获取原文并翻译 | 示例
           

摘要

Overlapping activities with imprecise durations to accelerate schedules has an impact on scheduling a construction project. The project may need to be rescheduled to suit the available overdraft limitation rather than to adopt the least total cost schedule. However, past research has seldom conducted a risk analysis on the project cash flow and overdraft requirements for projects with overlapping activities in a fuzzy environment. This research uses fuzzy DSM-based scheduling and proposes an algorithm to calculate the cash flow and overdraft at different risk levels. A numerical example is illustrated to demonstrate the algorithm's effectiveness.
机译:持续时间不精确的重叠活动会加快进度,这会对进度计划的建设产生影响。可能需要重新计划项目以适应可用的透支限制,而不是采用总成本最低的计划。但是,过去的研究很少对在模糊环境中活动重叠的项目的现金流量和透支需求进行风险分析。该研究使用基于模糊DSM的调度,并提出了一种算法来计算不同风险水平下的现金流量和透支。数值例子说明了该算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号