...
首页> 外文期刊>Journal of China University of Mining and Technology >Determination of Rational Staggered Distance Between Double-Longwall Faces in Mining Operation On Confined Aquifer
【24h】

Determination of Rational Staggered Distance Between Double-Longwall Faces in Mining Operation On Confined Aquifer

机译:承压含水层开采中双长壁工作面合理错开距离的确定

获取原文
获取原文并翻译 | 示例
           

摘要

The influence of staggered distance on the failure of floor bed is locally and temporarily defined in double-longwall mining on the confined aquifer. When the longwall mining reaches a certain scale, the deepest failure of floor bed depends on macroscopic technological parameters of mining and geo- logical conditions. The temporary as well as the terminal failure depth does not change with the min- ing staggered distance (5~30 m). Based on the mining and geological conditions on the 2 635 double longwall mining panel of Yangzhuang coal Mine, the changes of abutment pressure was observed and numerically simulated. The result shows that the rational staggered distance should be not more than 10 m.
机译:在承压含水层上的双长壁开采中,局部和临时确定了错开距离对底板破坏的影响。当长壁开采达到一定规模时,底板的最深破坏取决于开采的宏观技术参数和地质条件。临时和终端失效深度不会随采矿交错距离(5〜30 m)而变化。根据杨庄煤矿2 635双长壁开采面板的开采和地质条件,观察并数值模拟了基台压力的变化。结果表明,合理的错开距离应不大于10m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号