...
首页> 外文期刊>Navy international >Stretched thin: New Zealand's amphibious ship plan puts spotlight on scarce resources
【24h】

Stretched thin: New Zealand's amphibious ship plan puts spotlight on scarce resources

机译:捉襟见肘:新西兰的两栖舰船计划将稀缺资源放在首位

获取原文
获取原文并翻译 | 示例

摘要

One of the main highlights of the New Zealand Ministry of Defence's (MoD's) new Defence Capability Plan (DCP), released in June, was the decision to procure a new multirole sealift vessel. According to the DCP, the type of vessel that could be considered is a landing platform dock (LPD) that would complement and then replace the Royal New Zealand Navy's (RNZN's) existing ship, HMNZS Canterbury. The so-called 'Enhanced Sealift Capability' programme even includes plans to buy a second LPD - but this has distracted attention from changes implemented in other programmes. The MoD is struggling to sustain capabilities for the New Zealand Defence Force (NZDF) on its remaining budget of about NZD14.2 billion (USD9.5 billion), which has to last until 2030.
机译:6月发布的新西兰国防部新国防能力计划(DCP)的主要亮点之一是决定购买新的多用途海上运输船。据DCP称,可以考虑的船型是登陆平台码头(LPD),该平台将补充并取代新西兰皇家海军(RNZN)的现有船HMNZS Canterbury。所谓的“增强海上运输能力”计划甚至包括购买第二个LPD的计划-但这分散了对其他计划实施的变更的关注。英国国防部正努力维持其新西兰国防军(NZDF)的能力,其剩余预算约为142亿新西兰元(合95亿美元),该预算将持续到2030年。

著录项

  • 来源
    《Navy international 》 |2019年第7期| 1214-15| 共3页
  • 作者

    Tim Fish;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号