...
首页> 外文期刊>Jane's navy international >UK vexes on future surface fleet void
【24h】

UK vexes on future surface fleet void

机译:未来地面舰队上的英国Vexes无效

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Equipment capability staff in the UK Ministry of Defence (MoD) are reassessing force mix options for the Royal Navy's (RN's) future surface fleet after the demise of the Future Surface Combatant (FSC) programme. The move, which means that the entry to service of a new warship class meeting the requirements set out by the FSC project is unlikely to occur until after 2020, comes as the MoD attempts to balance future operational requirements with an overheated equipment budget and the limited capacity of the industrial base. The FSC programme had twice previously been knocked back from its Initial Gate milestone. However, the re-establishment of an Integrated Project Team (IPT) in the Defence Procurement Agency (DPA) in September 2003 seemed to signal a renewed commitment to the programme.
机译:在未来水面作战员(FSC)计划废除后,英国国防部(MoD)的装备能力人员正在重新评估皇家海军(RN)未来水面舰队的部队混合选择。此举意味着满足FSC项目设定要求的新军舰级服役直到2020年后才可能发生,当时国防部试图平衡未来的作战需求与设备预算过热和有限的使用之间达成平衡。工业基地的能力。 FSC计划先前曾两次被其“初始登机门”里程碑取消。但是,2003年9月在国防采购局(DPA)中重新组建了一个综合项目小组(IPT),这似乎标志着对该计划的重新承诺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号