...
首页> 外文期刊>Jane's Defence Weekly >Ajax deliveries to British Army delayed
【24h】

Ajax deliveries to British Army delayed

机译:阿贾克斯向英军交付的时间被推迟

获取原文
获取原文并翻译 | 示例

摘要

Deliveries of production-standard Ajax armoured vehicles to the British Army have been delayed, missing a key target to allow soldiers to start training to use their new vehicles. The UK Ministry of Defence (MoD) confirmed to Jane's on 15 January that a target for the manufacturer, General Dynamics Land Systems-UK (GDLS-UK), to deliver the first squadron set of vehicles by the end of 2019 had been missed. The ministry told Jane's in March 2019 that the first squadron would begin receiving vehicles, comprised of a mix of all six variants, in mid-2019, with the first turret variant fitted with the CTA International 40 mm cannon delivered between July and September 2019. It was then intended that the Household Cavalry Regiment would begin training on the vehicles for a year before the declaration of an initial operational capability (IOC) in mid-2020.
机译:生产标准的Ajax装甲车向英国陆军的交付被推迟了,没有达到允许士兵开始训练使用新车的主要目标。英国国防部(MoD)在1月15日向简氏(Jane's)确认,错过了制造商通用动力陆地系统英国(GDLS-UK)在2019年底之前交付首批中队车辆的目标。国防部在2019年3月告诉Jane's,第一个中队将在2019年中期开始接收包含所有六个变体的混合装甲车,而第一个炮塔变体将在2019年7月至9月间交付,配备CTA国际40毫米大炮。然后,打算在2020年中期宣布初始作战能力(IOC)之前,家用骑兵团将开始对车辆进行一年的训练。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号