...
首页> 外文期刊>Jane's Defence Weekly >British Army equipment plans vulnerable to cuts
【24h】

British Army equipment plans vulnerable to cuts

机译:英国陆军装备计划容易受到削减

获取原文
获取原文并翻译 | 示例

摘要

Ambitious plans to re-equip and reorganise the British Army are at risk from future defence cuts later this decade, according to the UK National Audit Office (NAO) spending watchdog. In its second annual assessment of the UK Ministry of Defence's (MoD's) 10-year equipment procurement plan, the NAO revealed that British Army modernisation plans, dubbed Future Force 2020, depend on GBP4.7 billion (USD7.8 billion) of what is termed "unallocated funding" being made available to it from 2017. This is more than half of the MoD's 'head room' funds still unallocated to specific projects.
机译:英国国家审计署(NAO)的开支监管机构称,雄心勃勃的重新装备和重组英国军队的计划在未来十年的国防削减中处于危险之中。 NAO在对英国国防部(MoD)的10年设备采购计划进行的第二次年度评估中透露,被称为“未来力量2020”的英国陆军现代化计划的预算为47亿英镑(78亿美元),从2017年开始向其提供称为“未分配资金”的资金。这是国防部仍未分配给特定项目的“净额”资金的一半以上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号