Construction Site Layout Planning Problem Using Metaheuristic Algorithms: A Comparative Study

机译:施工现场布局规划问题采用地产造物学算法:比较研究

获取原文
获取原文并翻译 | 示例
       

摘要

Material handling is one of the essential activities in the construction industry. Suitable location of facilities in the construction site can affect the costs and duration of the construction material handling process. The construction site layout planning to supply material and engineering demands within the minimum transportation distance is a quadratic assignment problem. Metaheuristics are widely used to solve construction site layout planning problems. In this article, the performance of four metaheuristic algorithms called charged system search, whale optimization algorithm, vibrating particles system, and enhanced vibrating particles system (EVPS) are compared in terms of their effectiveness in resolving a practical construction site layout problem. Results show that EVPS performs better than the other three methods.
机译:物料处理是建筑业的基本活动之一。施工现场的适当位置可以影响建筑材料处理过程的成本和持续时间。施工现场布局规划在最小运输距离内提供材料和工程需求是一种二次分配问题。半养殖广泛用于解决施工现场布局规划问题。在本文中,在解决实际施工现场布局问题的有效性方面,比较了称为带电系统搜索,鲸料优化算法,振动粒子系统(EVPS)的四种成交算法,鲸类优化算法,振动粒子系统(EVPS)的性能。结果表明,EVPS比其他三种方法更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号