...
首页> 外文期刊>International Water Power & Dam Construction >Lessons learnt from the Wenchuan earthquake
【24h】

Lessons learnt from the Wenchuan earthquake

机译:汶川地震的教训

获取原文
获取原文并翻译 | 示例

摘要

Based on the recent observations made in China, the following conclusions can be drawn:rn1. Following a strong earthquake, the seismic hazard at dam sites have to be increased and the seismic design guidelines have to be reviewed and updated.rn2. In mountainous regions large rockfalls have to be expected, which hinder access to dams after an earthquake for many weeks and months, and rockfalls can cause substantial damage to surface powerhouses, gates, piers, and appurtenant structures.rn3. The earthquake hazard has many features which are site-specific, therefore a standard approach in which emphasis is only put on ground shaking is problematic.
机译:根据中国最近的观察,可以得出以下结论:发生强烈地震后,必须增加大坝现场的地震灾害,并必须审查和更新抗震设计准则。在山区,必须预料会发生大的落石,这会在地震后的数周和数月内阻碍大坝的通行,而落石会严重破坏地表厂房,大门,墩台和附属结构。rn3。地震灾害具有许多针对特定地点的特征,因此仅强调地面震动的标准方法是有问题的。

著录项

  • 来源
  • 作者

    Martin Wieland; Chen Houqun;

  • 作者单位

    ICOLD Committee on Seismic Aspects of Dam Design, Poyry Energy Ltd;

    ICOLD Committee on Seismic Aspects of Dam Design, Academician, China Academy of Engineering, China Institute of Water Resources and Hydropower Research, Beijing, China;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号