首页> 外文期刊>International Water Power & Dam Construction >Dulas completes hydro scheme on existing Welsh Water reservoir
【24h】

Dulas completes hydro scheme on existing Welsh Water reservoir

机译:Dulas完成了威尔士现有水库的水利计划

获取原文
获取原文并翻译 | 示例
           

摘要

Renewable energy consultancy Dulas has completed a 250kW hydroelectric scheme at Welsh Water's existing Llys y Fran reservoir. The scheme, located in a Pembrokeshire country park, controls the flow release to the river Syfynwy to support abstraction at a pumping station located some 15km downstream. Commissioned in September 2017, the scheme is already approaching 1 million kWh of generated electricity, and will power a planned visitors centre, activity hub and boathouse, as well as exporting energy to the National Grid.
机译:可再生能源咨询公司Dulas已在威尔士水务公司现有的Llys y Fran水库完成了250kW水电计划。该方案位于彭布罗克郡的郊野公园中,控制流向Syfynwy河的流量,以支持下游约15公里处的抽水站的抽水。该计划于2017年9月投入运行,目前已接近100万千瓦时的发电量,并将为计划中的游客中心,活动中心和船库提供动力,并向国家电网出口能源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号