...
首页> 外文期刊>International Transactions on Electrical Energy Systems >Short-term transmission maintenance scheduling based on the Benders decomposition
【24h】

Short-term transmission maintenance scheduling based on the Benders decomposition

机译:基于Benders分解的短期输电维护计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper proposes a modified Benders decomposition method to solve a new short-term transmission maintenance scheduling model in vertically integrated power systems. The model aims to minimize the maintenance cost and the expected cost of lost load. The random failures of transmission components and system reliability constraints are also considered. Since traditional heuristic algorithms cannot guarantee the global optimal solution for this mixed-integer nonlinear programming problem, the Benders decomposition is adopted despite some difficulties due to the problem features. Compared with that of generation maintenance scheduling, the specific difficulties of transmission maintenance scheduling are analyzed and several modifications are proposed to improve the convergence of the Benders decomposition. In addition, the influenced energy index is introduced to select the critical branches and reduce computational complexity in reliability evaluation as well. Numerical results of a test system demonstrate that the modified Benders decomposition method is highly efficient in arranging short-term transmission maintenance. Copyright © 2014 John Wiley & Sons, Ltd.
机译:本文提出了一种改进的Benders分解方法,以解决垂直综合电力系统中的新的短期输电维护调度模型。该模型旨在最大程度地减少维护成本和预期的空载成本。还考虑了传输组件的随机故障和系统可靠性约束。由于传统的启发式算法不能保证对此混合整数非线性规划问题的全局最优解,因此尽管存在问题,但仍存在一些困难,但仍采用Benders分解。与发电维护计划相比,分析了输电维护计划的具体难点,并提出了几种改进措施,以提高Benders分解的收敛性。另外,引入影响的能量指数以选择关键分支,并且还降低了可靠性评估中的计算复杂性。测试系统的数值结果表明,改进的Benders分解方法在安排短期传动维护方面非常有效。版权所有©2014 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号