...
首页> 外文期刊>International railway journal >Spain still setting the pace for high-speed
【24h】

Spain still setting the pace for high-speed

机译:西班牙仍在设定高速发展的步伐

获取原文
获取原文并翻译 | 示例

摘要

Despite Spain's economic woes, the country's love affair with high-speed trains is far from over. As IRJ went to press, the candidates best positioned to win the general election on December 20 all had one thing in common: a commitment to continue the massive investment in the AVE network while promising to keep a tight control over the public deficit in 2016. The Ministry of Public Works and Transport fell short of its promise to open 800km of new lines during 2015, but nevertheless succeeded in inaugurating the Valladolid - Leon, Santiago - Vigo, Seville - Cadiz, and Olmedo - Zamora high-speed lines, the latter opening on December 17. Expansion will continue this year with plans to open Venta de Baftos -Burgos (75km), Antequera - Granada (100km), Monforte del Cid - Murcia (62km), La Robla - Pola de Lena (44km including the 25km Pajares Base Tunnel), and the 165km western section of the Madrid - Extremadura - Portugal line.
机译:尽管西班牙经济不景气,但该国对高速火车的热爱还远远没有结束。在IRJ付印之时,最有资格在12月20日赢得大选的候选人都有一个共同点:承诺继续对AVE网络进行大规模投资,同时承诺将在2016年严格控制公共赤字。公共工程和运输部没有履行其在2015年开设800公里新线的承诺,但仍成功开通了巴利亚多利德-莱昂,圣地亚哥-维哥,塞维利亚-加的斯和奥尔梅多-萨莫拉的高速铁路,后者12月17日开放。今年的扩张计划将继续进行,计划开放Venta de Baftos -Burgos(75km),Antequera-Granada(100km),Monforte del Cid-Murcia(62km),La Robla-Pola de Lena(44km,包括25km) Pajares Base Tunnel),以及马德里-埃斯特雷马杜拉-葡萄牙线的165公里西段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号