...
首页> 外文期刊>International railway journal >Vienna starts work on U-Bahn expansion
【24h】

Vienna starts work on U-Bahn expansion

机译:维也纳开始扩建U-Bahn

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A ceremony was held in Vienna on October 8 to mark the start of construction on a U-Bahn project to split Line U2 and build two extensions to create a longer Line U2 and a new Line U5. The first phase, which will cost more than €lbn, will involve boring a runnel from Matzleinsdorferplatz north to Rathaus, where new platforms for Line U2 will be built beneath the existing U2 platforms. The latter will then be used by the new Line U5 which will take over the existing Rathaus - Karlsplatz section of Line U2. A new section of Line U5 will be constructed to the north of Rathaus to reach Franckplatz in 2024 followed by a further section via Michelbeuern-AHK to Elterleinplatz by 2026.
机译:10月8日,在维也纳举行了仪式,以标志着U-Bahn项目的建设开始,该项目将拆分U2线,并建造两个扩建部分,以创建更长的U2线和新的U5线。第一阶段的费用将超过10亿欧元,将涉及从Matzleinsdorferplatz向北钻凿一条隧道到Rathaus,在那里将在现有U2平台下建造U2线的新平台。然后,新的U5线将使用后者,它将接管U2线的现有Rathaus-Karlsplatz部分。 U5线的新部分将在Rathaus的北部建造,到2024年到达Franckplatz,然后在2026年再经过Michelbeuern-AHK到达Elterleinplatz。

著录项

  • 来源
    《International railway journal》 |2018年第11期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号