首页> 外文期刊>International journal of systems assurance engineering and management >Maintenance budget estimation for a particle accelerator system under its contextual conditions: a case study
【24h】

Maintenance budget estimation for a particle accelerator system under its contextual conditions: a case study

机译:上下文条件下粒子加速器系统的维护预算估算:一个案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Precise estimation of annual maintenance budget (AMB) drives appropriate maintenance actions. There appears to be a dearth of historical data to evaluate the AMB for a particle accelerator system as these are not many. This paper presents a case study on estimating the AMB of such a system for its contextual conditions using relational matrix of the budget variables. The diagonal elements of the matrix represent the variables while the off-diagonal elements signify the degree of influence among these. The maintenance budget function is evaluated from this matrix and is used to evaluate the AMB for the Pel-letron system as a percentage of its asset replacement value. The actual maintenance expenditure on the Pelletron system was found to be within 2.07% of the estimated AMB. The approach is expected to aid the maintenance managers of similar systems, which operate under contextual conditions unique to their laboratory.
机译:年度维护预算(AMB)的精确估算可推动采取适当的维护措施。由于粒子加速器系统的AMB并不多,因此历史数据似乎很少。本文提出了一个案例研究,即使用预算变量的关系矩阵来估计此类系统的AMB的上下文条件。矩阵的对角元素表示变量,而非对角元素表示这些变量之间的影响程度。维护预算函数从该矩阵进行评估,并用于评估Pel-letron系统的AMB(占其资产重置价值的百分比)。发现Pelletron系统的实际维护支出在估计的AMB的2.07%之内。预期该方法将有助于类似系统的维护管理人员,这些系统在其实验室特有的环境条件下运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号