...
首页> 外文期刊>International Journal of Reliability, Quality and Safety Engineering >Consideration of Uncertainties and Risks in the Building Process of Multifunctional Harbor Transshipment Complex
【24h】

Consideration of Uncertainties and Risks in the Building Process of Multifunctional Harbor Transshipment Complex

机译:多功能港口转运综合体建设过程中不确定性和风险的考虑

获取原文
获取原文并翻译 | 示例
           

摘要

The present paper discusses types of management uncertainty exemplified by the case study of a project of building a multifunctional harbor transshipping center. The analysis is based on the ideas and works of I. Fischer. The paper shows that the role of project management actors substantially influences risks and that change of the actor's role leads to minimization of risks and elimination of uncertainty about project realization time. To analyze project risks the authors develop a complex model of risk assessment based on analysis of probability and impact level of undesired events. Probability of undesired events is presented as a matrix of risk ranks and a tool for analyzing project risks based on the matrix of risk ranks and FMEA analysis is developed.
机译:本文以建设多功能港口转运中心项目为例,讨论了管理不确定性的类型。该分析基于费舍尔的思想和著作。本文表明,项目管理参与者的角色在很大程度上影响了风险,而参与者角色的改变导致风险最小化并消除了项目实现时间的不确定性。为了分析项目风险,作者基于对意外事件的概率和影响水平的分析,开发了一个复杂的风险评估模型。将不希望发生的事件的概率表示为风险等级矩阵,并开发了基于风险等级矩阵和FMEA分析的项目风险分析工具。

著录项

  • 来源
  • 作者单位

    Peter the Great St. Petersburg Polytechnic University St. Petersburg, Monitoring Center, Russia 195251 St. Petersburg, Polytechnicheskaya 29;

    Peter the Great St. Petersburg Polytechnic University St. Petersburg, Monitoring Center, Russia 195251 St. Petersburg, Polytechnicheskaya 29;

    Peter the Great St. Petersburg Polytechnic University, St. Petersburg Department for Linguistics and Intercultural Communication Russia 195251, St. Petersburg, Polytechnicheskaya, 29;

    Samara State Aerospace University, Department for Quality Management Samara, Russia 443086, Samara, MoskovskoyeShosse, 34;

    Samara State Aerospace University, Department for Quality Management Samara, Russia 443086, Samara, MoskovskoyeShosse, 34;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Standardization; risk; FMEA; change; project;

    机译:标准化;风险;FMEA;更改;项目;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号