首页> 外文期刊>International journal of project organisation & management >Factors that influence cost overruns in South African public sector mega-projects
【24h】

Factors that influence cost overruns in South African public sector mega-projects

机译:影响南非公共部门大型项目成本超支的因素

获取原文
获取原文并翻译 | 示例
           

摘要

The purpose of the study was to identify and analyse the main factors that influence the project cost and schedule overrun within the construction industry. A survey was conducted using questionnaires and personal interviews with selected professionals in the construction industry. The empirical analysis found the change in scope of work on site, incomplete design at the time of tender, contractual claims (extension of time with cost), lack of cost planning and monitoring of funds, and delays in costing variations and additional works as important. It is necessary to identify factors that may influence construction cost and schedule overruns at the start of the project in order to ensure a decrease in cost overruns and to improve the cost performance on megaprojects.
机译:该研究的目的是识别和分析影响建筑行业项目成本和进度超支的主要因素。使用问卷调查和对建筑行业中选定专业人员的个人访谈进行了调查。实证分析发现,现场工作范围发生了变化,招标时设计不完整,合同要求(时间延长且带有成本),缺乏成本计划和资金监控,成本变化的延迟以及其他额外工作都是重要的。必须确定可能影响施工成本的因素并在项目开始时安排超支,以确保减少成本超支并改善大型项目的成本绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号