首页> 外文期刊>International journal of project organisation & management >An investigation of implementation issues, process phases and knowledge areas of project management in the performance of construction supply chains
【24h】

An investigation of implementation issues, process phases and knowledge areas of project management in the performance of construction supply chains

机译:对建筑供应链绩效中项目管理的实施问题,过程阶段和知识领域的调查

获取原文
获取原文并翻译 | 示例
           

摘要

The purpose of this research is to empirically investigate linkages among implementation issues, process phases, and knowledge areas of project management in construction supply chain management (CSCM). This research has extended Behera et al. (2015) on implementation issues and process phases and applied key knowledge areas of project management to study performance of construction supply chain on finance, quality, logistics and innovation only. The findings from this innovative conceptualisation can contribute to develop strategies for construction supply chains. Decision makers involved in CSCM can find this study useful for developing a broader decision support for performance measurement involving both knowledge areas and process phases. The study is restricted by methodological limitations associated with snowball sampling and anonymous survey-based research within the limits of a single industry sector. The present study however may facilitate decision makers of CSCM with an empirically verified framework to draw pragmatic decision rules for better management of construction projects.
机译:本研究的目的是根据经验研究施工供应链管理(CSCM)中实施问题,过程阶段和项目管理知识领域之间的联系。这项研究扩展了Behera等人。 (2015)关于实施问题和过程阶段,并应用项目管理的关键知识领域来研究建筑供应链在财务,质量,物流和创新方面的绩效。这种创新概念的发现可以有助于开发建筑供应链的策略。参与CSCM的决策者可以发现本研究有助于为涉及知识领域和过程阶段的绩效评估提供更广泛的决策支持。这项研究受到与雪球采样和基于匿名调查的研究相关的方法学局限性的限制,该局限性属于单个行业。然而,本研究可以通过经验验证框架为CSCM的决策者提供便利,以制定务实的决策规则,以更好地管理建筑项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号