首页> 外文期刊>International Journal of Project Management >Effect of learning on line-or-balance scheduling
【24h】

Effect of learning on line-or-balance scheduling

机译:学习对生产线或平衡计划的影响

获取原文
获取原文并翻译 | 示例
       

摘要

An approach to formulate learning rates and include them in line-of-balance (LOB) calculations is proposed in this paper. Learning rates are generated by modifying historical learning rates of typical construction activities and by incorporating the Impact of relevant factors such as, number of operations in one unit, activity complexity, and job and management conditions. Fuzzy set theory is used to develop production rules to treat both factual and uncertain information.
机译:本文提出了一种制定学习率并将其纳入平衡线(LOB)计算的方法。学习率是通过修改典型建筑活动的历史学习率并结合相关因素(例如,一个单元中的操作数量,活动复杂性以及工作和管理条件)的影响而产生的。模糊集理论用于制定生产规则,以处理事实和不确定信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号