首页> 外文期刊>International Journal of Project Management >Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong
【24h】

Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong

机译:施工中的有效合作工具:香港MTRC TKE合同604的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

The use of a partnering approach to deliver construction projects seeks to avoid the confrontational setting where energy is used in a non-productive manner. Partnering calls for concerted effort from the project participants and aligns their often different and conflicting objectives. Reported partnering success stories are mostly descriptive. This paper reports a case study of a successful partnering venture in Hong Kong. The case study provides valuable information on how partnering was implemented by MTR Corporation Ltd., one of the pioneers in introducing partnering in the Hong Kong construction industry. Through interviews with the key contract participants and data collected throughout the contract period, the effective partnering tools were identified. It was found that the monthly partnering review meetings and the use of incentivisation underpinned the partnering success on the Tseung Kwan O Extension Contract 604.
机译:采用合作方式交付建筑项目的目的是避免能源以非生产方式使用时的对抗性环境。合作伙伴要求项目参与者共同努力,并调整他们通常不同且相互矛盾的目标。报告的合作成功故事大多是描述性的。本文报道了一个在香港成功合伙企业的案例研究。该案例研究提供了有关港铁公司如何实施合作的宝贵信息,该公司是在香港建筑业引入合伙人的先驱之一。通过与主要合同参与者的访谈以及整个合同期间收集的数据,确定了有效的合作工具。结果发现,每月的伙伴审查会议和激励措施的使用为将军澳延期合同604的伙伴关系成功奠定了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号