Risk management in the Lusoponte concession―a case study of the two bridges in Lisbon, Portugal

机译:Lusoponte特许权中的风险管理-以葡萄牙里斯本的两座桥梁为例

获取原文
获取原文并翻译 | 示例
       

摘要

The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
机译:Lusoponte的案例研究说明了葡萄牙政府授予的特许权,以资助,设计,建造和运营葡萄牙里斯本塔古斯上方的两座桥梁。它包括对项目背景的概述,以及对主要风险类别的分析,陈述了遇到的实际风险和所采取的缓解措施。在整个项目中,我们都非常关注整个生命周期的成本以及效率和成本控制方面的收益。从公共和私营部门都可以汲取的教训中,一个完整的风险管理分析不仅必须包括技术因素,而且还必须包括对环境和社会风险的现实评估。这些风险在某种程度上是可以忽略的,并且导致了项目开发的主要问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号