Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding

机译:资源和资金供应不确定的重复建设项目的随机资源受限调度

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabilistic distributions in lieu of single estimates. The problem is formulated as a chance-constrained program, which is converted to a deterministic equivalent and solved by means of common linear programming techniques. The proposed chance-constrained programming model is applied to a housing project with 100 units and a real-life tunnel project to illustrate its practical usefulness in determining project acceleration strategies and in conducting risk management analyses. Model verification is performed by Monte Carlo simulations to confirm that the probability of constraint satisfaction is beyond the required confidence level.
机译:在本文中,当资源和资金的供应不仅受到限制而且还存在不确定性时,我们将由相似资源(劳动力和设备)从一个位置重复执行的建设项目安排到另一个位置。因此,供应条件表示为概率分布,而不是单个估计。该问题被公式化为机会受限程序,然后转换为确定性等效程序,并通过常见的线性编程技术对其进行解决。拟议的机会约束编程模型被应用于一个有100个单元的住房项目和一个真实隧道项目,以说明其在确定项目加速策略和进行风险管理分析中的实用性。通过蒙特卡洛模拟执行模型验证,以确认约束满足的概率超出了所需的置信度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号