Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory

机译:基于资源理论的台北101建设项目团队战略评估

获取原文
获取原文并翻译 | 示例
       

摘要

Taipei 101, the tallest building in the world in 2004, is a super-large project that required many resources, exceeding a single contractor's capacity, and the project owner had to seek additional specialist contractors for the resource gaps. This paper presents an analytical model for the owner's teaming strategies on the inclusion of additional contractors. The proposed model, based on the resource-based theory and the fuzzy Delphi method, allows the owner to identify critical resources required by the project, evaluate the capacities of the contractors, and identify the resource gaps. The paper also compares the analytical result with the owner's actual decisions, and explains their differences.
机译:台北101号大楼是2004年全球最高的建筑,是一个超大型项目,需要大量资源,超出了单个承包商的能力,因此项目所有者不得不寻求其他专业承包商来解决资源缺口。本文提出了一个包含其他承包商在内的业主团队战略的分析模型。所提出的模型基于基于资源的理论和模糊Delphi方法,使所有者可以识别项目所需的关键资源,评估承包商的能力并识别资源缺口。本文还将分析结果与所有者的实际决策进行了比较,并解释了它们之间的差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号