Selecting a delay analysis method in resolving construction claims

机译:选择解决工程索赔中的延迟分析方法

获取原文
获取原文并翻译 | 示例
           

摘要

Delays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious issue. Several delay analysis methods are available but no one method can be universally used over another in all situations. The selection of the proper analysis method depends upon a variety of factors including information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. The paper reviews 20 research studies that discuss various aspects of delay analysis methods and summarizes the advantages and disadvantages of widely used delay analysis methods, including the as-planned vs. as-built, impact as-planned, collapsed as-built, and time impact analysis methods. The paper also discusses the most important issues in delay analysis that affect the results of the analysis. The selection of a suitable analysis method depends heavily on the availability of scheduling data, the familiarity of the analyst with the capabilities of the software used in the project, clear specifications in the contract concerning the treatment of concurrent delays and the ownership of float.
机译:延迟通常发生在建筑项目中。评估延迟的影响有时是一个有争议的问题。可以使用几种延迟分析方法,但是在所有情况下都无法普遍使用一种方法来代替另一种方法。适当分析方法的选择取决于多种因素,包括可用信息,分析时间,方法的功能以及分配给分析的时间,资金和工作量。本文回顾了20项研究,这些研究讨论了延迟分析方法的各个方面,并总结了广泛使用的延迟分析方法的优缺点,包括计划中的与建造中的,计划中的影响,建造中的坍塌和时间影响分析方法。本文还讨论了延迟分析中影响分析结果的最重要问题。选择合适的分析方法在很大程度上取决于调度数据的可用性,分析人员对项目所用软件功能的熟悉程度,合同中有关并发延误处理的明确规定以及浮动所有权。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号