首页> 外文期刊>International Journal of Project Management >BOT application in China: Driving and impeding factors
【24h】

BOT application in China: Driving and impeding factors

机译:中国的BOT应用:驱动因素和阻碍因素

获取原文
获取原文并翻译 | 示例
       

摘要

To adapt to the specific investment environments of China, the generic Build-Operate-Transfer (BOT) process has evolved into five basic BOT types with foreign private sector participation: Cooperative Joint Venture BOT (CJV BOT), Equity Joint Venture BOT (EJV BOT), Non-official Wholly Foreign Owned BOT, Official BOT, and BOT Variant. This study identified the driving and impeding factors about BOT application in China, and a survey of experienced practitioners indicated that the most significant driving factors are Needing infrastructure development capital; the most significant general impeding factors include complex financial arrangement, complex contractual arrangement, high up-front cost, complex process, and high risk; and the most significant China-specific impeding factors are opaque and inadequate legal system, complex approval system, Regulatory constraints on market entry, and low market prices for infrastructure products and services.
机译:为了适应中国的特定投资环境,通用的建造,运营,转让(BOT)流程已发展为五种具有外国私营部门参与的基本BOT类型:合作合资BOT(CJV BOT),股权合资BOT(EJV BOT) ),非官方全资拥有的BOT,官方BOT和BOT变体。这项研究确定了在中国应用BOT的驱动因素和阻碍因素,对经验丰富的从业人员进行的调查表明,最重要的驱动因素是需要基础设施建设资金。最主要的一般阻碍因素包括复杂的财务安排,复杂的合同安排,高昂的前期成本,复杂的流程和高风险;最具体的中国障碍因素是法律体系不透明,不完善,审批制度复杂,市场准入的监管限制以及基础设施产品和服务的市场价格低廉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号