Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model

机译:在Build-Operate-Transfer模型下评估私人参与的公共建设工程的进度延迟原因

获取原文
获取原文并翻译 | 示例
           

摘要

Project delivery method of Build-Operate-Transfer (BOT) increases the commencement probability of public construction works through private investments. Public construction works worldwide that adopt the BOT model as their project delivery method are increasing gradually. Although many BOT projects have been implemented at various stages, some projects encounter major obstacles for advancement. This study attempts to identify the delay causes in various stages of BOT projects. Opinions of BOT participants' replies are solicited using two questionnaire surveys. Those outcomes are analyzed using by traditional statistical methods and structural equation modeling method. Study results reveal that the stage of 'negotiation and signing of concession agreement' is the most essential stage, in which 'improper contract planning,' 'debt problem' and 'uncertainty on political issues and government-finished items' are the most significant delay causes. Identified causes of delay can be used to prevent the postponement of future BOT projects.
机译:建造-运营-转让(BOT)的项目交付方法通过私人投资增加了公共建设工程的启动概率。全球范围内采用BOT模型作为其项目交付方式的公共建筑工程正在逐渐增加。尽管许多BOT项目已在各个阶段实施,但有些项目仍面临重大的发展障碍。这项研究试图确定BOT项目各个阶段的延迟原因。使用两次问卷调查来征求BOT参与者的答复意见。使用传统的统计方法和结构方程建模方法对这些结果进行分析。研究结果表明,“谈判和签署特许协议的阶段”是最重要的阶段,其中“合同规划不当”,“债务问题”以及“政治问题和政府完成的项目的不确定性”是最重要的延迟。原因。确定的延迟原因可以用来防止将来的BOT项目推迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号