首页> 外文期刊>International Journal of Project Management >Identification and analyses of hidden transaction costs in project dispute resolutions
【24h】

Identification and analyses of hidden transaction costs in project dispute resolutions

机译:识别和分析项目争议解决中的隐藏交易成本

获取原文
获取原文并翻译 | 示例
       

摘要

The hidden transaction costs in project dispute resolutions exert an important influence on the decisions about dispute settlement. In order to obtain the variables and their importance rankings, we firstly developed a thirteen-variable framework of the hidden transaction costs through a literature review and semi-structured interviews. Then we conducted a questionnaire survey to collect the importance of each variable. Based on the results, it is possible to group these variables into five factors reputation, cooperation and trust, emotion, time, and execution of judgments by factor analysis. Lack of future cooperation and contractors' reputation damage are the two most important variables, while for owners, project delay is the most severe hidden transaction cost. The findings provide construction practitioners with a deep understanding of the potential hidden loss. Therefore, they will resolve disputes more rationally. (C) 2014 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:解决项目争端的隐性交易成本对解决争端的决定具有重要影响。为了获得变量及其重要性排名,我们首先通过文献回顾和半结构化访谈建立了一个十三变量隐藏交易成本的框架。然后我们进行了问卷调查,以收集每个变量的重要性。根据结果​​,可以通过因素分析将这些变量分为五个因素,声誉,合作与信任,情感,时间和判断执行。缺乏未来的合作和承包商的声誉受损是两个最重要的变量,而对业主而言,项目延迟是最严重的隐性交易成本。这些发现使建筑从业人员对潜在的潜在损失有了深刻的了解。因此,他们将更加合理地解决争端。 (C)2014 Elsevier Ltd. APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号