首页> 外文期刊>International Journal of Project Management >Development of performance metrics for phase-based capital project benchmarking
【24h】

Development of performance metrics for phase-based capital project benchmarking

机译:为基于阶段的资本项目基准制定绩效指标

获取原文
获取原文并翻译 | 示例
       

摘要

Despite various research efforts focusing on the development of an effective measurement system, most project performance metrics were designed for post evaluation of processes and practices after project completion. This paper presents performance metrics tailored to phase-based benchmarking, which can be utilized as both leading and lagging indicators. Built upon industry experts' input and an extensive review of existing metrics, a framework for performance metrics was developed to evaluate performance outcomes for five major phases; front end planning/programming, design/engineering, procurement, construction, and startup/commissioning. Within this framework, phase-wise and phase-specific metrics were created under the categories of cost, schedule, efficiency, staffing, procurement, and safety performance. The results show that the framework and metrics are effective for the evaluation of project performance throughout capital project delivery. By employing the benchmarking process during the course of the project, industry practitioners can improve project performance and develop proactive strategies for subsequent phases. (C) 2015 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:尽管进行了大量研究工作,重点是开发有效的度量系统,但大多数项目绩效指标都是为项目完成后的流程和实践进行后期评估而设计的。本文介绍了针对基于阶段的基准测试量身定制的性能指标,这些指标可同时用作领先指标和落后指标。在行业专家的意见和对现有指标的广泛审查的基础上,开发了绩效指标框架,以评估五个主要阶段的绩效结果;前端计划/编程,设计/工程,采购,建造和启动/调试。在此框架内,在成本,进度,效率,人员配备,采购和安全绩效类别下创建了按阶段和针对特定阶段的指标。结果表明,该框架和指标可有效评估整个基本项目交付中的项目绩效。通过在项目过程中采用基准测试过程,行业从业人员可以提高项目绩效并为后续阶段制定积极的策略。 (C)2015 Elsevier Ltd. APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号