首页> 外文期刊>International Journal of Project Management >Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
【24h】

Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review

机译:基于BIM的施工网络中的协作:文献计量-定性文献综述

获取原文
获取原文并翻译 | 示例
       

摘要

BIM-based Construction Networks (BbCNs) are teams comprising members from several specialist organisations to undertake BIM-related tasks on BIM-enabled projects. Fostering collaboration within BbCNs is a top priority for construction project managers, yet no explicit body of knowledge has focused on investigating the relevant research gaps in knowledge. The present study intends to address this gap by plotting the storyline of relevant research studies in the last 10 years (2006-2016). A "Collaboration Pentagon" consisted of context, process, task, team and actor as the theoretical lens is created through integration of relevant frameworks. The study draws upon a bibliometric analysis of 1031 studies on BIM alongside the outcome of a qualitative evaluation of a total of 62 carefully selected papers on collaboration in BbCNs. The findings reveal that the scholarship on collaboration on BIM-enabled projects has predominately focused on technology as one antecedent of collaboration while project-related and managerial antecedents have remained under-researched. Moreover, though enhancing collaboration necessitates inclusion of all influential antecedents, studies with such an all-inclusive perspective are rare. The study contributes to the field through this inclusive Collaboration Pentagon and by providing a systematic and objective evaluation of available literature on collaboration in BbCNs and uncovering respective gaps. (C) 2017 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:基于BIM的施工网络(BbCN)是由几个专业组织的成员组成的团队,负责在启用BIM的项目中承担与BIM相关的任务。加强BbCN内部的协作是建设项目经理的头等大事,但没有明确的知识体系专注于调查相关的研究空白。本研究旨在通过绘制过去10年(2006-2016年)相关研究的故事情节来弥补这一差距。一个“协作五角大楼”由情境,过程,任务,团队和参与者组成,通过整合相关框架创建了理论镜头。该研究基于对BIM的1031项研究的文献计量分析,以及对总共62篇关于BbCN协作的精心选择论文的定性评估结果。研究结果表明,有关BIM支持项目的合作奖学金主要集中于技术作为合作的先决条件,而与项目相关和管理的先决条件仍在研究中。而且,尽管加强协作需要包括所有有影响的先例,但很少有具有这种包容性观点的研究。该研究通过这种包容性的协作五角大楼,并通过对BbCN中协作的现有文献进行系统和客观的评估并发现各自的差距,为该领域做出了贡献。 (C)2017爱思唯尔有限公司APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号