首页> 外文期刊>International Journal of Production Research >More MILP models for hybrid flow shop scheduling problem and its extended problems
【24h】

More MILP models for hybrid flow shop scheduling problem and its extended problems

机译:混合流动店调度问题的更多MILP模型及其扩展问题

获取原文
获取原文并翻译 | 示例
       

摘要

With the rapid development of computer technology and related softwares for mathematical models, mathematical modelling of scheduling problems is receiving growing attention from researchers. In this work, the hybrid flow shop scheduling problem with unrelated parallel machines (HFSP-UPM) with the objective aimed to minimise the makespan is studied. According to the characteristics of the HFSP-UPM, eight mixed integer linear programming (MILP) models are formulated in order to obtain optimal solutions based on different modelling ideas. Then, these models are extended to solve HFSP-UPM with sequence-dependent setup times (HFSP-UPM-SDST), no-wait HFSP-UPM (HFSP-UPM-NW) and HFSP-UPM with blocking (HFSP-UPM-B). All the proposed models and the existing model are detailedly compared and evaluated under three aspects namely modelling process, size complexity and computational complexity. Numerical experiments show that MILP models dependent on diverse modelling ideas perform very differently. The model developed based on stage precedence is the best one and should be given preference in future applications. In addition, the proposed models of HFSP-UPM-NW and HFSP-UPM-B improve several best known solutions for the test instances in the existing literature.
机译:随着计算机技术的快速发展和数学模型的相关软件,调度问题的数学建模正在接受研究人员的关注。在这项工作中,研究了具有无关的平行机(HFSP-FUPM)的混合流量店调度问题,其目的是最小化MEPESPAN的目标。根据HFSP-UPM的特性,配制了八种混合整数线性编程(MILP)模型,以便根据不同的建模思路获得最佳解决方案。然后,这些模型扩展以解决具有序列依赖的设置次数(HFSP-UPM-SDST),无等待HFSP-UPM(HFSP-UPM-NW)和HFSP-UPM具有阻塞的HFSP-UPM(HFSP-UPM-B )。详细比较所有所提出的模型和现有模型,并在三个方面进行比较和评估,即建模过程,尺寸复杂性和计算复杂性。数值实验表明,敏捷模型依赖于不同的建模思想表现得非常不同。基于阶段优先级开发的模型是最好的模型,应该在将来的应用程序中优先考虑。此外,提出的HFSP-UPM-NW和HFSP-UPM-B模型提高了现有文献中的测试实例的几种最佳已知的解决方案。

著录项

  • 来源
    《International Journal of Production Research》 |2020年第14期|3905-3930|共26页
  • 作者单位

    Huazhong Univ Sci & Technol State Key Lab Digital Mfg Equipment & Technol Wuhan Hubei Peoples R China;

    Huazhong Univ Sci & Technol State Key Lab Digital Mfg Equipment & Technol Wuhan Hubei Peoples R China;

    Huazhong Univ Sci & Technol State Key Lab Digital Mfg Equipment & Technol Wuhan Hubei Peoples R China;

    Huazhong Univ Sci & Technol State Key Lab Digital Mfg Equipment & Technol Wuhan Hubei Peoples R China|Liaocheng Univ Sch Comp Sci Liaocheng Shandong Peoples R China;

    Huazhong Univ Sci & Technol State Key Lab Digital Mfg Equipment & Technol Wuhan Hubei Peoples R China|Jinan Univ Sch Intelligent Syst Sci & Engn Zhuhai Campus Jinan Shandong Peoples R China;

    Ningbo Univ Fac Mech Engn & Mech Ningbo Zhejiang Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    hybrid flow shop scheduling; sequence-dependent setup times; no-wait; blocking; mixed integer linear programming;

    机译:混合流量店调度;依赖依赖性设置时间;不等待;阻塞;混合整数线性规划;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号