首页> 外文期刊>International Journal of Production Research >A critical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die) methodology
【24h】

A critical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die) methodology

机译:对Shingo的“ SMED”(单分钟换模)方法的严格评估

获取原文
获取原文并翻译 | 示例
       

摘要

Shigeo Shingo's 'SMED' methodology has been at the forefront of retrospective changeover improvement activity since the mid-1980s. The 'SMED' method- ology, which emphasizes that improvement should be sought primarily by rear- ranging changeover elements into external time, has been widely acclaimed and has been widely assimilated into academic texts and industrial training material.
机译:自1980年代中期以来,Shigeo Shingo的“ SMED”方法就一直处于追溯性转换改进活动的最前沿。 “ SMED”方法强调应首先通过将转换要素重新安排到外部时间来寻求改进,这一方法已广受赞誉,并已被广泛吸收到学术著作和行业培训材料中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号