Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates

机译:集成的工作发布和车间调度,以最大程度地减少在制品并按时交货

获取原文
获取原文并翻译 | 示例
       

摘要

We address the problem of releasing jobs to the factory floor while meeting delivery dates and minimizing the work-in-process inventory. Heuristic algorithms were developed that used an efficient, detailed shop-floor scheduling model to determine the release times of new jobs. The process starts with the current shop floor conditions and determines the sequencing of both in-process and new jobs on machines in order to minimize the maximum lateness (L_(max)). The approach is tractable for industrial-sized problems and provides solutions close to a calculated lower bound for WIP. Computational experience is given.
机译:我们解决了在满足交货日期的同时将工作放到工厂车间并最大程度地减少在制品库存的问题。开发了启发式算法,该算法使用高效,详细的车间调度模型来确定新作业的发布时间。该过程从当前车间条件开始,并确定机器上正在进行的作业和新作业的顺序,以最大程度地减少最大延迟(L_(max))。该方法可解决工业规模的问题,并提供接近于WIP计算得出的下限的解决方案。给出了计算经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号