首页> 外文期刊>International Journal of Production Research >Redesign of production flow lines to postpone product differentiation
【24h】

Redesign of production flow lines to postpone product differentiation

机译:重新设计生产流水线以推迟产品差异化

获取原文
获取原文并翻译 | 示例
       

摘要

Redesign of a multi-product production system to delay product differentiation to final stages of the production is a planning problem. We propose two nonlinear binary optimisation models for determining the optimal stage for differentiating each product. The first model maximises the expected value of profit and the second model maximises the value of options to postpone product differentiation. We use the results from financial basket options pricing theory to formulate and solve the second model. We devise an efficient tabu-constrained randomised search algorithm to obtain models solution, and use parametric analysis of a numerical example to verify the models and gain insight into the product differentiation problem.
机译:重新设计多产品生产系统以将产品差异化推迟到生产的最后阶段是一个计划问题。我们提出了两个非线性二进制优化模型,用于确定区分每种产品的最佳阶段。第一个模型使利润的期望值最大化,第二个模型使推迟产品差异化的期权价值最大化。我们使用金融篮子期权定价理论的结果来制定和求解第二种模型。我们设计了一种有效的禁忌约束的随机搜索算法来获取模型解,并使用数值示例的参数分析来验证模型并深入了解产品差异问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号