首页> 外文期刊>International Journal of Production Research >A fuzzy assembly line balancing problem with physical workload constraints
【24h】

A fuzzy assembly line balancing problem with physical workload constraints

机译:具有物理工作量约束的模糊装配线平衡问题

获取原文
获取原文并翻译 | 示例
       

摘要

Although assembly lines are designed to be highly efficient and very cost effective, they have been criticised for their effects on workers. Assembly workers usually perform repetitive tasks and sit or stand for long periods of time, therefore they are at high risk of work-related injuries such as musculoskeletal disorders. In this study, we present a new assembly line balancing problem that incorporates not only task precedence and processing times but also physical workloads in order to reduce work-related injuries. We consider the physical workload of a task as a fuzzy concept and propose a fuzzy linear programming model. The proposed model is applied to an assembly line balancing problem in a textile company and to some of the benchmark problems in order to illustrate the effects of physical workloads.
机译:尽管流水线设计为高效且极具成本效益,但因其对工人的影响而受到批评。装配工人通常执行重复性的工作,长时间坐着或站着,因此他们面临与工作有关的伤害,例如肌肉骨骼疾病。在这项研究中,我们提出了一个新的流水线平衡问题,该问题不仅包括任务优先级和处理时间,还包括物理工作量,以减少与工作有关的伤害。我们将任务的物理工作量视为模糊概念,并提出了模糊线性规划模型。所提出的模型适用于一家纺织公司的装配线平衡问题和某些基准问题,以说明物理工作量的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号