机译:组装和多阶段作业车间中“到期日期”设置规则的性能:模拟评估
CEMUC - University of Coimbra, Mechanical Engineering Department, Polo II Pinhal de Marrocos, Coimbra, Portugal;
University of Hong Kong, Department of Industrial and Manufacturing Systems Engineering, Hong Kong;
Lancaster University, Department of Management Science, Lancaster University Management School, Lancaster University, Lancaster, UK;
CEMUC - University of Coimbra, Mechanical Engineering Department, Polo II Pinhal de Marrocos, Coimbra, Portugal;
Federal University of Sao Carlos, Department of Industrial Engineering, Rodovia Washington Luis, Monjolinho, Sao Carlos, Brazil;
due date setting; assembly job shop; multi-stage job shop; simulation;
机译:具有权重时间和拖延性的多层装配车间的优先调度规则的性能评估
机译:具有权重时间和拖延性的多级装配车间中优先调度规则的性能评估
机译:两级多阶段车间的工作量控制和订单下达:模拟评估
机译:基于模拟的半同工业4.0架构新工作店调度规则的绩效评估
机译:在“作业车间”,“批处理车间”和“流水线制造”设置中探索精益实施成功的因素。
机译:队伍教学中的仿真仿真:设置和性能评估
机译:装配车间和多阶段车间中到期日期设置规则的性能:模拟评估
机译:基于模拟的工作绩效评估方法;会议文件