The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation

机译:组装和多阶段作业车间中“到期日期”设置规则的性能:模拟评估

获取原文
获取原文并翻译 | 示例
       

摘要

Setting short yet reliable Due Dates (DDs) is an important early production planning and control task. The majority of job-shop research on DD setting assumes simple product structures without assembly operations. However, in practice, product structures are often complex, and multiple final assembly operations may be required. This paper evaluates the performance of DD setting rules in the context of complex product structures, considering two scenarios: two-level assembly job shops, where orders converge on one final assembly operation; and two-level multi-stage job shops, where a series of assembly operations are undertaken. New rules are proposed which are substantially simpler and more suitable for practical use than those in the literature. These rules are only outperformed by a more sophisticated rule from the wider literature, newly introduced into the context of assembly and multi-stage job shops. Which rule to apply in practice depends on whether a manager considers the improvement in performance more important than the loss of simplicity. Future research should investigate how jobs can be planned and controlled effectively when some or all DDs are set externally by customers rather than internally using a DD setting rule.
机译:设置短而可靠的到期日(DDs)是重要的早期生产计划和控制任务。关于DD设置的大多数车间研究都假定简单的产品结构而无需组装操作。但是,实际上,产品结构通常很复杂,可能需要进行多个最终组装操作。本文考虑了两种情况,评估了在复杂产品结构的情况下DD设置规则的性能:两级组装车间,订单集中在一个最终组装工序上;以及两层的多阶段车间,在那里进行一系列组装操作。提出了新的规则,这些规则比文献中的规则实质上更简单并且更适合实际使用。这些规则仅在更广泛的文献中被更复杂的规则所超越,这些文献是新近引入到装配和多阶段作业车间中的。在实践中应用哪个规则取决于经理是否认为绩效的提高比失去简单性更为重要。未来的研究应该调查当部分或全部DD由客户在外部而不是在内部使用DD设置规则设置时如何有效地计划和控制作业。

著录项

  • 来源
    《International Journal of Production Research》 |2012年第20期|p.5949-5965|共17页
  • 作者单位

    CEMUC - University of Coimbra, Mechanical Engineering Department, Polo II Pinhal de Marrocos, Coimbra, Portugal;

    University of Hong Kong, Department of Industrial and Manufacturing Systems Engineering, Hong Kong;

    Lancaster University, Department of Management Science, Lancaster University Management School, Lancaster University, Lancaster, UK;

    CEMUC - University of Coimbra, Mechanical Engineering Department, Polo II Pinhal de Marrocos, Coimbra, Portugal;

    Federal University of Sao Carlos, Department of Industrial Engineering, Rodovia Washington Luis, Monjolinho, Sao Carlos, Brazil;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    due date setting; assembly job shop; multi-stage job shop; simulation;

    机译:截止日期设置;装配车间;多阶段工作坊;模拟;