首页> 外文期刊>International Journal of Production Research >Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures
【24h】

Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures

机译:具有多阶段产品结构的可压缩处理时间的多周期批量确定和车间调度

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents mathematical modelling of joint lot sizing and scheduling problem in job shop environment under a set of working conditions. The main feature of the problem is to deal with flexible machines able to change their working speeds, known as process compressibility. Furthermore, produced items should be assembled together to make final products. In other words, the products have a multilevel structure, shown with bill of materials. As the problem is proved to be strongly NP-hard, it is solved by a memetic algorithm here. Computational experiences on the data of 'Mega Motor' company are reported. Also, further experiences on random test data confirm the performance of the proposed method with less than 5.02% optimality gap while solving the problems in very shorter times than CPLEX 12.0.
机译:本文提出了在一组工作条件下,车间作业环境中的联合批量确定和调度问题的数学模型。问题的主要特征是处理能够改变其工作速度的柔性机器,即过程可压缩性。此外,生产的物品应组装在一起以制成最终产品。换句话说,产品具有多层结构,并与物料清单一起显示。由于该问题被证明是很强的NP难题,因此可以通过模因算法解决。报告了有关“ Mega Motor”公司数据的计算经验。此外,有关随机测试数据的进一步经验证实,与CPLEX 12.0相比,该方法的最佳解决方案具有小于5.02%的最佳差距,同时可以在很短的时间内解决问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号