首页> 外文期刊>International Journal of Production Research >Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application
【24h】

Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application

机译:钢铁行业中的连铸机和带钢热轧机的分层调度:块计划应用

获取原文
获取原文并翻译 | 示例
           

摘要

This work addresses the joint scheduling of continuous caster and hot strip mill processes in the steel industry. Traditionally, slab yards are used to decouple these two stages. However, the rising importance of energy costs and reduced logistic effort gives motivation for a combined scheduling. For each of the processes, a mixed-integer linear optimisation model based on the block planning principle is presented. This approach develops production schedules that take technological sequences of steel grades and milling programmes into account. We consider the integrated steel plant of an international steel company as a case study. Numerical results demonstrate the practicability of this approach under experimental conditions, which reflect typical settings from an industrial application in the steel industry.
机译:这项工作解决了钢铁行业中连铸机和热轧机工艺的联合调度问题。传统上,平板码用于分离这两个阶段。但是,能源成本重要性的提高和物流工作量的减少为组合调度提供了动力。针对每个过程,提出了基于块规划原理的混合整数线性优化模型。这种方法制定了生产计划,其中考虑了钢种和铣削程序的技术顺序。我们以一家国际钢铁公司的综合钢铁厂为例。数值结果证明了该方法在实验条件下的实用性,反映了钢铁行业工业应用中的典型设置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号